Projects
Project Details
Blanchfield Army Community Hospital
- Location: Fort Campbell, Kentucky
- Use: Hospital
- Square Footage: 61,000
- Electrical Contract: $11,133,125
- Total Contract:
- General: Mortenson Construction
- Owner: USACE Little Rock
- Engineer: Affiliated Engineers, Inc.
Scope
Consolidated the Adult Behavioral Health and Child and Family Behavioral Health System About 4,500 square-feet was added to the Mother-Baby Unit. Parking was also expanded, and a new helipad constructed. Renovated the administrative building (“A” wing), adding about 4,600 square-feet of space. The old emergency center also received an overhaul. A new 13,540 square-foot emergency center opened earlier this year and the old 8,025 square-foot center was remodeled into a waiting, reception and triage area. The hospital’s Central Utility Plant was also upgraded. Scope of work included all electrical, fire alarm/mass notification, communications, nurse call, intercom/paging, access control, queuing, CATV, medium voltage, motor control centers, substations, duct banks, manholes, site lighting, parking lot lighting, fiber optic.